SPLOST 2016 Projects


  Project List    District  Estimated Cost  Status 
FACILITIES: 
         
  Animal Control Facility (map)   $1,500,000   Design contract approved 
50% Design Contract due 5/16
  Veterans Memorial (map)   $1,500,000   Design contract approved
Budgeting
             
DRAINAGE:
         
  St. Simons Island Village Drainage Improvements (map)    2 $600,000   Concepts completed by consultant. Working on final Phase 1 plans
  Arnold Rd. Tide Gates Replacement    2 $100,000    Bids received +/- $300k.
  College Park Drainage Outfall Improvements (map)   4 $1,000,000   Modeling Completed - draft report prepared
  Chapel Crossing Rd. Drainage Improvements (map)    4 $350,000   Meeting with FLETC to work on project scope.
  Somersby Point to Martin Palmer Dr. Drainage Improvements (map)   1 $75,000   Easement requests rejected. Letters sent to adjacent property owners.
  Golden Isles Parkway Extension Drainage Improvements (map)   1 $2,100,000   Preparing RFQ
  Box Culvert Replacement on Old Jesup Rd. near Lillie Way (map)   3 $350,000   Preparing IFB for EOM May advertisement
  North Harrington Drainage Outfall Improvements   2 $400,000   Preparing IFB for EOM May advertisement
  Hornet Dr. Drainage Outfall Improvements   4 $800,000   BOC authorized engineering contract. Project kickoff meeting to be scheduled
  Sea Island Rd. Ditch Piping Improvements   2 $300,000   Working concepts
             
ROADS, SIDEWALKS & BRIDGE:
         
  Road Resurfacing and Road Shoulder Widening     $10,662,846  

2018 LMIG begins 5/24/18

  Road Reconstruction and Resurfacing on Old Jesup Road near Everett City (map)   1 $850,000   Rebid with new scope
  Canal Rd. Project Improvements (map)   3 $4,000,000   preparing routing alternatives
  Extension of Dungeness Dr. (map)   1 $400,000   Looking at new connection point
  Dirt Road Paving
- May Joe St. (map)
- Maple St.
- Hopeton
- Bennfield
- Pennick Rd. (map)
- Cindy Tr. (map)
  1,2,3 $3,000,000   Surveys Completed




Awaiting RFP for Pennick
  Sidewalk along Gateway Center Blvd   3 $200,000   Finishing RFP
  Sidewalk Project along Harry Driggers Blvd. (map)   3 $1,100,000   Bids for preliminary engineering services received. Working with state and county to satisfy purchasing requirements
 
  Sidewalk Improvements along Ocean Blvd. (map)   2 $150,000   Writing IFB
  Sidewalk Improvements along Frederica Rd.   2 $490,000   Defining scope
  Sidewalk along U.S. Highway 341 (map)   1 $270,000   Bid Received $184,650
  Sidewalk in Harrington area on St. Simons Island (maps)   2 $250,000   Bids due 4/3. Awaiting May Finance Meeting
  Sidewalk along Chapel Crossing Rd.   2 $540,000   Writing RFP/ Design
  Bridge Construction Project over South Palm Ditch on US Hwy 17 (map)   4  $1,725,000   Trying to coordinate easement requirements with commercial property along project
             
INTERSECTION IMPROVEMENTS
   
  Intersection Improvements at Sea Island Rd. and Hamilton Rd. Intersection
  $73,200
  Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Frederica Rd. and Demere Rd. Roundabout (map)
  $33,200   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Frederica Rd. and Riverview Dr. Intersection (map)
  $31,400
  Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Frederica Rd. and Sea Island Rd. Intersection (map)
  $286,800   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Ocean Blvd. and Mallery St. Intersection (map)   $277,200   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Sea Island Rd. and Hamilton Landing Dr. Intersection (map)   $101,400   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at East Beach Causeway and Ocean Boulevard (map)   $1,354,700   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at East Beach Causeway and Demere Rd. Intersection (map)   $850,900   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Sea Island Rd. and Demere Rd.    $124,200   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at Kings Way and Frederica Rd. Intersection    $1,291,000   Kickoff Meeting April 2018, Working Concepts
  Intersection Improvements at GA SR 25 Spur and Altama Connector Intersection (map)   $3,250,000   Kickoff Meeting April 2018, Working Concepts
  Frederica Rd. Traffic Flow “go around” (“eyebrow”) Lane Improvements     $76,000   Kickoff Meeting April 2018, Working Concepts
             
JOINT WATER & SEWER (Documents)
         
  Rehabilitation and Rerouting North Mainland District (Sewer Collection Lines, Basins, and Lift Stations)     $11,700,000
  Design contract approved
  Replacement of City of Brunswick Deteriorated Collection (Sewer Collection Lines and Lift Stations)     $3,300,000   Preliminary engineering underway
             
JEKYLL ISLAND
         
   Roads -- Resurface 10 miles of streets and public parking lots     $2,300,000    
             
CITY OF BRUNSWICK (Documents)
         
  Engineering & Public Works
- Norwich Street Repaving (4th to 10th) (map)
    $10,205,857    
  Public Safety     $1,945,040    
  Neighborhood & Community Services     $1,681,257    
Estimated cost: $400,000.00